Turbinto

Turbinto greenfield solar park was constructed in Murcia in southeastern Spain by a Spanish subsidiary of the German firm Gehrlicher Solar AG. It was completed on schedule in April 2011.  

The planning phase decided on polycrystalline modules from Yingli Solar. A long-term operations and maintenance plan was drawn up during the acquisition. It covers both the plant availability and performance. 

WOC’s technical Asset Management Team oversaw the construction phase. The project was purchased using Group equity. The PV power plant is fully integrated into WOC's online monitoring system which allows for short reaction time in case of technical deficits.

Technical data

  • Type Greenfield, fixed system
  • Power 2.242 kWp
  • Energy Yield 3.703.281 kWh/p.a.
  • Module type Polycristalline, Yingli Solar (YL235P-29b)
  • Inverter Ingecon 500HE
  • Operation start 08.06.11