Contreras

The greenfield solar park was constructed by a Spanish subsidiary of Gehrlicher Solar AG in Murcia in southeastern Spain. It went into operation in June 2011.

The facility uses polycrystalline modules from the manufacturer Yingli Solar, in line with the project plans. Polycrystalline PV-modules convert sunlight to solar power with an efficiency rating of up to 15 percent.

WOC’s technical Asset Management Team oversaw the construction phase, issuing secured payments in installments tied to construction benchmarks. The project is fully integrated in WOC's online monitoring system. This allows to react quickly in case of the operation is interrupted and to initiate respective technical works.

 

 

Technical data

  • Type Greenfield, fixed system
  • Power 3.146 kWp
  • Energy Yield 5.135.231 kWh/p.a.
  • Module type Polycristalline, Yingli Solar (YL230P-29b)
  • Inverter Ingecon 500HE
  • Operation start 22.06.11